H & J Martin have utilised UltraFloor’s Level IT Two smoothing underlayment to complete a 350 sqm project at South West College’s Enniskillen campus in Northern Ireland.
Background
Situated at the heart of the Tyrone and Fermanagh communities, South West College welcomes 14,000 students each year, with a dedicated staff of over 500 full and part-time employees. In preparation for the upcoming academic year, the college’s Enniskillen campus recently underwent a 350 sqm flooring renovation.
The Challenge
As a new influx of students was soon to arrive, it became imperative that the project be completed on time and to a standard befitting South West College’s esteemed reputation.
The finished floor required a super smooth surface to eliminate safety hazards for students and staff walking across the campus. Additionally, it needed to be highly durable in order to withstand the constant foot traffic on the stairs and through the corridors.
The Solution
H & J Martin, a team of specialist flooring contractors, were hired for this project. They started by removing the old Marmoleum flooring from the staircases and corridors. Once the existing floorcovering had been removed, H & J Martin scarified the concrete substrate before priming with UltraFloor Prime IT Multi-surface Primer and levelling with Level IT Two multi-purpose smoothing underlayment.
Formulated to promote the adhesion to all UltraFloor smoothing underlayments, Prime IT Multi-surface Primer reduces pinholing, minimising the risk of costly failures. With a coverage rate of 200 sqm at 3:1 dilution, Prime IT Multi-surface Primer is a must-have product for all flooring installation projects.
There are many reasons why Level IT Two has become UltraFloor’s most popular floor leveller. Its exceptional flow characteristics make it a very easy material to apply to a variety of subfloors in both commercial and domestic flooring projects. Its low odour formulation means this fantastic all-rounder leveller is equally suited to confined areas, proving particularly popular in the education, health and hospitality sectors.
With a set time of 2.5 hours, Level IT Two can receive bonded floor coverings after just 8 hours, making it an ideal choice for projects with a tight deadline. What’s more, because Level IT Two is available as a two component system, it takes the guesswork out of mixing, reducing site errors and guaranteeing a perfect application every time.
Once Level IT Two had cured, the Gerflor Mipolam Affinity floorcovering was installed across the 350 sqm area.
Results
The expertise of H & J Martin and the exceptional work of UltraFloor have resulted in students and staff now enjoying the stunning new facilities at South West College.
On using Level IT Two, Sean O’Reilly, Flooring Manager at H & J Martin, commented: “Level IT Two was ideal for this job. It’s perfect for going over concrete, has great strength and a smooth finish for laying vinyl floor covering.”
To find out more about UltraFloor’s subfloor preparation portfolio, please visit ultra-floor.co.uk. You can contact UltraFloor’s team of flooring experts by emailing ultrafloor@instarmac.co.uk or calling +44 (0) 1827 254402.